FY 2023-2028 CIP Budget Book
1 Transportation Engineering Apr ‐ 24 12 months Design Environmental Right of Way Construction Management Construction Total Project Costs Estimated Maintenance Cost: Proposed Proposed Fund # Fund Name 2023 ‐ 24 2024 ‐ 25 2025 ‐ 26 2026 ‐ 27 2027 ‐ 28 Future Years 100 General Fund ‐ $ 1,232,921 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 1,232,921 $ 105 Quality of Life Measure 744,383 $ 735,000 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 1,479,383 $ 220 Measure A 558,721 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 558,721 $ 301 Grants ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 320 Capital Projects 2,003,245 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 2,003,245 $ 509 DIF 17 ‐ Roads 1,145,090 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 1,145,090 $ 520 DIF Citywide ‐ Public Use & Comm. Fac. ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 526 DIF Citywide ‐ Circulation 3,864,349 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 3,864,349 $ 527 DIF Citywide ‐ Storm Drain Facilities 600,000 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 600,000 $ 105 Reserves 223,872 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 223,872 $ 0 UNFUNDED ‐ $ 5,000,000 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 5,000,000 $ 9,139,660 $ 6,967,921 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 16,107,581 $ 9,139,660 $ 16,107,581 $ 16,107,581 $ 16,107,581 $ 16,107,581 $ 16,107,581 $ 16,107,581 $ CIP 13 ‐ 04 CUMULATIVE TOTALS Bradley Road Bridge Over Salt Creek Construction Duration: Target Construction Start: Project Cost by Phase Department: Category: Priority: Strategic Plan Goal: Project Phase: PROJECT BUDGET DETAILS https://cityofmenifee.maps.arcgis.com/apps/Shortlist/index.html?appid=8604e81f1bb14fd3bda909f8ca27a5ea Project Description, Purpose, and Need: Fund Source Approved Funding to date TOTALS Bradley Road is prone to flooding during rain events, which has historically presented hazards to motorists and resulted in closure of the roadway. The project will replace the existing Bradley Road grade crossing on Salt Creek with a proposed 2 ‐ lane bridge from Rio Vista Drive to Potomac Drive. The proposed bridge includes a 12 ‐ foot median, 8 ‐ foot shoulders on both sides, street lights, and 6 ‐ foot pedestrian sidewalks on both sides. In addition the project proposed to construct major storm drains and re ‐ align the existing Salt Creek Trail crossing to the bridge level. Environmental / Design Project Map Connectivity & Mobility Current Year Estimates TOTAL 16,107,581 $ Street maintenance over a 15 year period will consist of a Slurry seal treatment at years 5 and 10, and AC overlay at year 15. Maintenance cost over a 15 year period is estimated to be $380,000. Street Maintenance is typically funded by Gas Tax, Measure A, Measure DD, and SB1 funds. 627,546 $ 552,614 $ 500,000 $ 1,545,000 $ 12,882,421 $ Future Funding Estimates * 46
Made with FlippingBook
RkJQdWJsaXNoZXIy ODIzODM4